Mikes Woodshop v2.0

Mike's NEW woodshop build archive

thanks for looking, I resized the photo's so this page will load faster

Construction time lapse movie on YouTube, GmanInd channel

Jump to: Page2 Inside finishing ceiling fan blade

Ground was broken Summer 2012

Don Andrews Concrete construction poured the foundation, walls and floor

 

   

 

 

 

existing garage was stripped back, overhang cut off.

Rick and I laying out the first walls.

 

  

 

Click here for Time lapse video of truss setting

Youtube time lapse video of sheeting north end

 

\

 

Shell completed in time for the first winter

 

powered by:

 

 more progress on Page 2


E-mail: Gmanind@comcast.net

 


  !